PROJECTS
We express pride in successful completion of projects with various Government, Semi Government agencies and Private Sector organizations detailed hereunder
Sr. No | Name of Project | Project Cost (Rs.Crore) | Project Agency | Project Year | Brief description of project activities |
1 | Up-gradation to Two Lanes with paved shoulder / Four lane Configurations of Nanded-Kinwat-Mahur- Arni (33Km) in the state of Maharashtra for Package- 1 from existing Km 21/000 at Bhokar to km 54/000 at Sarsamb Br (Design Km 0/000 (at Bhokar) to Km 33/000 (at Sarsamb Br). (Total Length = 33.000km) | 180 | NH PWD Maharashtra MoRTH Project | 2017-2018 | Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
2 | Construction of Two Lane with Paved Shoulder of Nashik - Peth Section of NH 848. – (Total Length 50 Km) | 190 | NH PWD Maharashtra MoRTH Project | 2016-2017 | Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
3 | Two laning with Paved Shoulder for Chilpi Kawardha project in state of Chattisgarh- NH 12 A (Design Ch.191.422 to 242.300). (Total length - 50 Km) | 197 | NH PWD Chhattisgarh MoRTH Project | 2017-2018 | Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
4 | Improvement to Khandwa, Bhendwal, Paturda, Ukli, Ner, Nandkhed, Kinkhed, Daryapur, Asegaon, Chandur, Bazar, SH 278 road in km 0/000 to 33/500 Taluka Jalgaon(J)& Sangrampur Dist. Buldhana. (Total Length – 33.50 Km) | 78 | PWD Maharashtra | 2018-2019 | Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
5 | Upgradation from Bamni to Navegaon Section of NH 353B Design Chainage – from km 242+150 to km 284+400 of Chandrapur-Ballarpur-Kothari-Gondpipri- Ashti Road to two lane with Paved Shoulders / four lane configuration in the state of Maharashtra on EPC mode. (Total length – 42.2 Km) | 164 | NH PWD Maharashtra MoRTH Project | 2018-2019 | Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
6 | Improvements to Math Kudal-Shivdav-Kadgaon-Gargoti Road, SH-179, Km 55/000 to 94/000, Tal. Bhudargad, in Kolhapur District in the state of Maharashtra. (Total Length – 39 Km) | 106 | PWD Maharashtra | 2019-2020 | Complete detailed engineering for project in role of Design Director for the National Highway project including services for Survey, Investigation, Traffic engineering, detailed design (geometrics, pavement, hydraulics and structural) and all drawings including structures, etc complete and getting approved from Proof, Safety Consultants and Authority Engineer |
7 | REHABILITATION & STRENTHENING OF NH-222 for Two Lane with Paved Shoulder under NHDP IV Km 101/00 to 161/570 IN STATE OF MAHARASHTRA. (Total Length – 60 Km) | 230 | NH PWD Maharashtra MoRTH Project | 2016-2017 | Safety Consultants for the project appointed by NH PWD Maharashtra |
8 | Two Laning Paved Shoulder for NH-218 from Design Ch.4.400 to 56.000 (Bijapur Hubli Section Package I) in the State of Karnataka. (Total Length – 51.4 Km) | 190 | NH PWD Karnataka MoRTH Project | 2017-2018 | Safety Consultants for the project appointed by NH PWD Karnataka |
9 | Providing Two laned Paved shoulder in Km 311/800 to Km 340/00 (Aurangabad- Nagar Naka-Ellora) of NH-211 in the State of Maharashtra on EPC mode. (Total Length – 29 Km) | 90 | NH PWD Maharashtra MoRTH Project | 2015 | Proof Consultant for project appointed by NH PWD Maharashtra |
10 | DEVELOPMENT AND OPERATION OF AHMEDNAGAR-PATHARDI SECTION OF NH-222 (FROM KM 232+000 TO KM 284+000) IN THE STATE OF MAHARASHTRA. (Total Length – 52 Km) | 180 | NH PWD Maharashtra MoRTH Project | 2015 | Proof Consultant for project appointed by NH PWD Maharashtra |
11 | Up-gradation of Section 55+937 Km to 114+486 Km of NH-75 2E from Shirur to Kharda in the state of Maharashtra on EPC Mode. (Total Length – 58.5 Km) | 280 | NH PWD Maharashtra MoRTH Project | 2017 | Detailed Topographic survey, Geotechnical investigation, soil testing, inventory survey and traffic surveys for the detailed design for NH Project |
12 | Rehabilitation and Up-gradation of Ahmedpur to Pimpla Junction from Existing Km 183+000 (Ahmedpur on SH 56) to Existing Km 127+885 (Pimpla junction on SH 56) (Design km 0+00 to km 55+623) of AhmedpurKinagaon-Ambejogai- Kaij-Manjarsumbha-Patoda-Jamkhed SH 56 road to Two lane with paved shoulders instate of Maharashtra. (Total Length – 55.60 Km) | 300 | MSRDC, MoRTH Project | 2017 | Detailed Topographic survey, Geotechnical investigation, soil testing, inventory survey and traffic surveys for the detailed design for NH Project |
13 | Road Asset Management System (RAMS) for 1400 Km network of Pune City under Smart Cities Mission of Government of India. | NA | Pune Smart City Corporation Ltd, Pune | 2017-2020 | Development of a GIS based Asset Management system for Pune city Road network of 1400 Km roads which included complete asset and inventory data collection with NSV, development of new Software system RAMS and maintenance management recommendations for road network using HDM4 Package |
14 | Pilot project for Development of Smart City Streets in ABB area of Pune Smart City | 20 | Pune Smart City Corporation Ltd, Pune | 2017-2020 | Complete Project Management Consultancy including DPR and Project Supervision for Smart City Project |
15 | IRDP Project for SHIRDI City (Length 4.5 Km- 4 Lane) | 10 | Maharashtra State Road Development Corporation | 2010-2012 | Complete Project Management Consultancy including DPR and Project Supervision for IRDP Project |
16 | Rehabilitation of Urban Roads with UTWT and Thin White Topping (TWT) technology in PMC area (various projects) (Total Length 60km) | 125 | Pune Municipal Corporation | 2011-2015 | Complete Project management including DPR and supervision for Rehabilitation of urban roads using innovative UTWT above 60 Km length in Pune city |
17 | IMPROVEMENT OF ROAD PUNE-SATARA FROM SWARGATE CHOWK TO KATRAJ CHOWK INCLUDING FOOTPATH, CYCLE TRACK UNDER B. R. T. (Total length – 5.5 Km- Eight lane Project) | 95 | Pune Municipal Corporation | 2018-2020 | Complete Project management including DPR and supervision for prestigious Bus Rapid Transit Project in Pune City |
18 | Dehu Alandi Road (6 Laning Project) for 30 m DP width in PCMC area.(Total length – 15.05 Km- 6 lane) | 206.86 | Pimpri Chinchwad Municipal Corporation | 2012-2016 | Complete DPR, supervision and project management for project |
19 | Strengthening of Bus Docking area near BRTS Bus station – Kivale road.(2 Lane, Length 676m) | 5 | Pimpri Chinchwad Municipal Corporation | 2018-2019 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
20 | Constuction of concrete road in Shahu nagar prabhag no-9 of PCMC area.(4 Lane, Length 300m) | 5 | PCMC | 2017-2018 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
21 | Development of cement concrete road in PCMC area.(2 Lane, Length 980m) | 7 | Pimpri Chinchwad Municipal Corporation | 2016-2017 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
22 | Development Beautification and concretization of roads in Sambhajinagar of PCMC Prabhag no.-09.(4 Lane, Length 700m) | 4 | Pimpri Chinchwad Municipal Corporation | 2017-2018 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
23 | Development of internal concrete road in prabhag no-9 of PCMC area.(2 Lane, Length 200m) | 2 | Pimpri Chinchwad Municipal Corporation | 2016-2017 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
24 | Development of 7.5m wide Road from Vadagaon BK to P. L. Deshpande Udyan along canal side, Pune.(Total length 6.0 Km 2 lane) | 40 | Pune Municipal Corporation | 2016-2019 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
25 | Development of 18 m DP Road from BSNL Office on Sinhagad Road uptoVadgaonBudruk along with Canal Bridge.(Bridge Length – 30m Canal Bridge + 15m Baby Canal Bridge) | 7 | Pune Municipal Corporation | 2012-2013 | Complete DPR, supervision, project management of Bridge Project |
26 | Safety Audit of Pilot BRTS works of Pune (Pune Satara Road and Pune Sholapur Road) | NA | Pune Municipal Corporation | 2014 | Safety Audit of the completed BRTS project |
27 | Development of 30 m DP Road along with Canal Bridge from Ganga Bhaghyoday Building towards Vadgoan Bk on Sinhagad Road area(Bridge Length – 30m Main Canal and 20 m on Baby canal) | 14 | Pune Municipal Corporation | 2012-2013 | Complete DPR, supervision, project management of Bridge Project |
28 | Development of Baner DP Roads in PMC Area (Total Length 6 Km 4 Lane) | 38 | Pune Municipal Corporation | 2013-2015 | Complete DPR, supervision and project management for project roads |
29 | Development of Wakad DP Roads in PMC Area (Total Length 7 Km 4 Lane) | 45 | Pimpri Chinchwad Municipal Corporation | 2013-2015 | Complete DPR, supervision and project management for project roads |
30 | Storm Water Drainage Improvement for Vadgaon Budruk Basin of Pune under JNNURM scheme | 44 | Pune Municipal Corporation | 2011-2013 | Complete Project Management Consultancy for SWD improvement works |
31 | Development of 2 Nos Bridges across River Ram (Total Bridge length 55 m each) | 18 | Pune Municipal Corporation | 2012-2014 | Complete Project Management Consultancy with DPR and Supervision for Bridge works |
32 | Storm Water Drainage Improvement for Baner Balewadi Basin of Pune under JNNURM scheme | 73 | Pune Municipal Corporation | 2011-2014 | Complete Project Management Consultancy for SWD improvement works |
33 | Storm Water Drainage Improvement for PCMC D Ward Basins of Pimpri Chinchwad Municipal Corporation under JNNURM scheme | 84 | Pimpri Chinchwad Municipal Corporation | 2011-2013 | Complete DPR preparation, approval from JNNURM, New Delhi |
34 | Subgrade & Material Investigation for NH 6 (Amravati Bypass to Gujrat Border in state of Maharashtra) | 450 | Louis Berger Consulting Engineers Pvt Ltd, Gurgaon for National Highway Authority of India (NHAI) | 2010-2011 | Complete subgrade evaluation, testing & material study, subgrade report for 483 Km National Highway stretch for 4 Laning project |
35 | Pavement Evaluation, Design and Material testing, evaluation studies for SH 141 - Karmala Tembhurni Section (BOT Project) | 550 | Supreme Infrastructure Pvt Ltd (Maharashtra PWD) | 2011-2012 | Pavement and Overlay Design, Complete subgrade and pavement evaluations studies, Geotechnical Investigation and Foundation designs for Bridges, Structures for SH 141 |
36 | Widening and improvement of Arnala-Virar-Shirsad- Ambadi- SH40 and Padgha- Washind Road MDR 45 under MMRDA, Maharsahtra State (Length of Road – 43.68 Km 4 Laning Project) | 207.25 | MMRDA through Monarch Consultants Pvt Ltd | 2011-2012 | Pavement and Overlay Design, Complete subgrade and pavement evaluation and design |
37 | Pavement Design & Material investigation for: Widening and improvement of Kalyan to Hal Phata (SH 35) and Karjat to Chowk (SH 38) for MMRDA (Project Length 72.44 Km Four Laning and Project Cost Rs. 289.29 Crore) | 289.29 | MMRDA through Monarch Consultants Pvt Ltd | 2011-2012 | Pavement and Overlay Design, Complete subgrade and pavement evaluation and design |
38 | Pavement Design & Material investigation for: Widening and improvement of Roads in Pashim Champaran District of Bihar under Bihar Road State-Development Corporation road upgradation program(Project Length 102.254 Km Four Laning) | 300 | Bihar State Road development Corporation | 2011-2012 | Pavement and Overlay Design, Complete subgrade and pavement evaluations studies |
39 | Pavement Evaluation, Design and Material testing, evaluation studies for SH 211 & SH 231 - Akkalkot Waghdari Road Project | 38 | Public Works Department- Maharashtra State for Astute Infrastructure | 2012-2013 | Pavement and Overlay Design, Complete subgrade and pavement evaluations studies |
40 | Kolhapur IRDP Project - BOT Project of Internal City Roads | 250 | Maharashtra State Road Development Corporation (IRB Infra Pvt Ltd) | 2009-2011 | Pavement Design for KOLHAPUR IRDP Project Maharashtra State Road Development Corporation: Pavement design engineer for BOT project for Kolhapur City IRDP Project- under MSRDC |
41 | Pavement Evaluation, Design and Material testing, evaluation studies for Sangli Kolhapur BOT Project | 240 | Public Work Department, Maharashtra State | 2011-2012 | Pavement and Overlay Design, Complete subgrade and pavement evaluations studies, Geotechnical Investigation and Foundation designs for Bridges, Structures for SH 141 |
42 | Development of new link and creek bridge near Mumbai City | NA | Private entrepreneur- DB realty Projects | 2008-09 | Development of a new link road for connection of suburbs near Mumbai City along with a Creek bridge |
43 | SH 7 – Shirwal Lonand Phaltan Baramati Project under PWD Maharashtra (BOT Project) | 250 | PublicWorks Department- Maharashtra | 2009-2010 | Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 Laning SH project |
44 | Improvement & development & resurfacing of DP roads in A Ward of PCMC (I) | 36 | Pimpri Chinchwad Municipal Corporation | 2009-2010 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
45 | Improvement & development & resurfacing of DP roads in A Ward of PCMC (II) | 40 | Pimpri Chinchwad Municipal Corporation | 2009-2010 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
46 | Development and institution of a GIS based Pavement Management System for the Road network in the Municipal Corporation jurisdiction | NA | Pune Municipal Corporation, Pimpri | 2007-2009 | Ongoing project on overall maintenance management and budget allocation for the 500 Km road network with the Municipal Corporation of Pune City, India |
47 | Development and institution of a GIS based Pavement Management System for the Road network in the Municipal Corporation jurisdiction | NA | Pimpri Chinchwad Municipal Corporation, Pimpri | 2006-2008 | Ongoing project on overall maintenance management and budget allocation for the 380 Km Road network with the Municipal Corporation of Pimpri Chinchwad, India |
48 | Amritsar Wagah Section of NH -1 under NHAI | 200 | National Highway Authority of India | 2007 | Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 Laning National Highway project |
49 | Third Party Inspection of Road, Building and SWD works in PMC Zonal Offices | 80 | Pune Municipal Corporation | 2008-2009 | Road Works, Building works and Storm Water drainage work of Zonal Offices in PMC area |
50 | Development Improvement Maintenance & Resurfacing of internal roads in A Ward of PCMC | 12 | Pimpri Chinchwad Municipal Corporation | 2008-2009 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
51 | Development of Mundhwa Bypass 45 m DP Road under JNNURM project (Project Length – 4 Km) | 35 | Pune Municipal Corporation | 2010-2012 | Full DPR and supervision, project management for development of major concrete arterial Road in PMC limit |
52 | Development & widening, resurfacing of NDA Road as per DP provisions for Pune Municipal Corporation | 11 | Pune Municipal Corporation | 2009 | Development of major sub arterial Road in PMC limit |
53 | Development & widening, resurfacing of Pashan – Sus Road as per DP provisions for Pune Municipal Corporation | 10 | Pune Municipal Corporation | 2008 | Development of major sub arterial Road (8 Km) in PMC limit |
54 | Pavement Management System Program for the integrated Road Development in the city of Pimpri Chinchwad | 140 | Pimpri Chinchwad Municipal Corporation | 2007-2008 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
55 | Improvement and resurfacing of Roads in A,B C & D Wards & MIDC of PCMC as per Pavement Management System | 60 | Pimpri Chinchwad Municipal Corporation, Pimpri | 2007-2008 | Improvement, resurfacing of Roads in PCMC limits |
56 | Maintenance & rehabilitation of Roads in various wards of Pune Municipal Corporation Pavement Management System | 55 | Pune Municipal Corporation | 2007-2008 | Complete DPR, supervision, project management of Urban Roads in PMC limits |
57 | Development of DP Roads in A,B C & D Wards of PCMC as per recommendations of Pavement Management System (Project length 35 Km) | 150 | Pimpri Chinchwad Municipal Corporation, Pimpri | 2007-2009 | Complete widening and development of major sub arterial Roads in PCMC limits as per Pavement Management System |
58 | Maintenance & rehabilitation of Roads in A,B C & D Wards of PCMC as per Pavement Management System | 30 | Pimpri Chinchwad Municipal Corporation, Pimpri | 2006-2007 | Maintenance and rehabilitation of Urban Roads in PCMC limits |
59 | Improvement & rehabilitation of Mumbai Pune National Highway between Dapodi & Nigadi (Project length 9 km) | 14 | Pimpri Chinchwad Municipal Corporation | 2006 | Rehabilitation of 10 Km Mumbai Pune National Highway stretch under PCMC limits |
60 | Andhra Pradesh State Highway APSH 7 & 8 Project (World Bank assisted) | 150 | Gayatri –IJM JV, Hyderabad, INDIA | 2004-2005 | Forensic analysis of pavement structure in India |